WEEK 3 : DC Motor (Ganerator)

Objectives: 
To buy the main component for the project.

Analysis/Discussion:

The first component that need to have is the heart of the projects that is the DC Motor. Today i have purchase Mini DC Motor from electronic store in Kuala Lumpur.



Figure 1:Mini DC Motor

Below is table regarding to specification of Mini DC Motor (generator).


                                                    Table 1:Specification of Mini DC Motor

Conclusion:
This is Mini DC  Motor. It has small size and light weight. This is a suitable motor for wind generator in my projects.


Friday, 18 September 2015

WEEK 2 : Research Mini DC Motor

Objective:
To research type,specification for DC Motor.

Analysis/Discussion:
This weak im doing some research about DC motor so that i can solution to increase the voltage from the output. as we know the DC motor use to convert electrical energy into mechanical energy electrified via its outputs.



Figure 12:  DC Motor type

Conclusion:
The DC motor there have 4 detail we need to pay attention.
  • power selection
  • power requirement
  • blade design
  • motor power 


Friday, 11 September 2015

WEEK 1 : The Beginning of Final Year Project II Degree

Objectives: 
To begin the next semester of Final Year Project called stage as FYP II.

 Analysis/Discussion:
The first week of second semester of final year project just started. All the listed components as had been managed in the previous proposal report was rechecked to aim to the right place for start searching process in making the prototype of the project. All available components for this project that already in market in this country are listed as below: 
1. DC power supply (12V)
2. Step Up DC-DC booster (4A)
3. Digital Volt-Amp meter(100VDC/10A)
4. DC Brushless Fan(12V)
5. Mini DC motor

Conclusion:
All needed item for this project need to be prepared by end of week 3.

Friday, 8 May 2015

WEEK 13 - THE SUBMISSION


Objective: To finish and submit the proposal report and blog to the supervisor.

Analysis/Discussion:

This is the last week for me to finish up my proposal report and blog because this week is the submission date. The last day to submit is on Friday. This week I need finish up the small parts in the report. The sections left are the 
  1. Abstract
  2. Table of Content
  3. Limitations 
  4. Conclusion
  5. Formatting the report
Conclusion:  

By Friday,08/05/2015, I should have submitted my proposal report and this blog. Though this maybe the end of FYP I course, but a much harder and difficult course of FYP II is waiting next semester. I should continue my research on the Wind Turbine using Cooler Fan.

Friday, 1 May 2015

WEEK 12 - THE PROPOSAL REPORT PART 2


Objective: To finalize the proposal report.

Analysis/Discussion:

This week I need to finalize my proposal report and the blog. The proposal report is almost 80% finished. But, this week I am a little bit busy with other reports I have only a little time to work on the proposal report. Fortunately, the proposal report is due next week.  

Discussion: A very small progress this week. I need to make it up in week 13.

Thursday, 23 April 2015

WEEK 11 - PRESENTATION DAY


Objective: Presenting the whole idea about project and the objective of the product.




Analysis/Discussion :

Students that had been list in the Final Year Project 1 that day must attend the presentation at Gemilang Hall to participate in presentation of project. Presentation starting at 2.00 pm until 5.00 pm. There is two assessor for a project presentation.

assessor 1 : Nadaraj A/L Miniappan
assessor 2 : IR Mohd Fairuz Bin Abdul Hamid

Conclusion:


Slide Presentation.


Thursday, 16 April 2015

WEEK 10 - PREPARATION FOR PRESENTATION


Objective: To prepare the slide show / power point.



Analysis/Discussion :

In week 10, all FYP semester 1 student will have their project presentation at Gemilang Hall. Then, the program had been postpone to week 11. The purpose of this presentation was to tell the assessor about the project ideas and the objective of producing the project. 

Contain Of the Slides :-

 1)  Introduction of the project
2)  Problem statement
3)  Objective
4)  Methodology
5)  Gantt Chart
6)  Budget
7)  Progress


Conclusion:

The correction has been done in week before presentation day, it must be no problem regarding to the correction that had been given from supervisor.